Previous Thread  Next Thread

chat icon PATH

rebeluma

Posted: Tue Oct 02, 2012 3:31 pm
Joined: 10 Sep 2012
Posts: 2
HELLO Smile
I have done several follow path constrains in different scens, but all of them begin at the start 0, and i want them to start in the beging of each scene.

What i mean is how i can put the time i want the follow path constrain begin?

Thank you so much!
Reply with quote


 
Jump to:  
Powered by phpBB © 2001, 2005 phpBB Group